Цельностальная опалубка СТАЛФОРМ — для строительства южного обхода Подольска
Engineering News STALFORMIn the construction of the road Southern bypass Podolsk in Moscow region concreted six of the seven pillars of the bridge over the river Zhestvenka. The 186.5 meters — long bridge is being built as part of the Regional Governor’s program — «Roads of Moscow.» The project’s objective is — to improve accessibility of residential areas in the southern part of the Podolsk municipal district, to reduce excessive runs of municipal, private and commercial vehicles.
STALFORM Engineering’s designers had prepared the formwork layout and its re-setting by pours in the process of building the superstructure. For erection of monolithic piers is used the all-metal circular columns STALFORM’s formwork with diameter of 1200 mm.
For manufacturing the all-metal modular radius formwork system, STALFORM Engineering’s designers and engineers proceeded from design and construction practice accepted in Russia. This secured its broad applicability. As an example, only during the last year, in manufactured by STALFORM the all-metal circular columns, were concreted piers for construction of overpasses at Yaroslavl, Warsaw, Volokolamsk highways in Moscow, circular columns at construction of Moscow Subways stations and a number of other construction projects.