Создана новая система тентовых укрытий для всепогодного строительства пролётных строений мостов и эстакад
Engineering News STALFORMIn construction of the Western High-Speed Diameter (WHSD) were completed works on erection of piers and in full swing are carried out concreting works on superstructure of bridges, overpasses and road junctions. For thermal and wind protection in the areas of complex configuration — with curved turns and a variable width of the carriageway — is used a new system of framework-canvass shelters.
Unlike conventional «heated enclosures» the new construction shelter can be altered during the work process and adapted to changing size and geometry of the concreted section. The width of the framework ranges from 15 to 40 m. The canvass covering is furnished with special apertures for concrete conveying pipe. The system is economical and easy to operate. The main volume of assembly operations, involves usage of quick — release couplings, which significantly saves installation and dismantling time.
Also, in order to speed up and simplify installation operations, all joined framework beams have continuous perforation, and the props, cross-braces and plates — levelled by length (± 10 mm) for adjustment in «place» of the already set-up shelters.
Construction of the WHSD is to be completed by 2017. Works are conducted almost around the clock. The universal system of construction shelters, manufactured by our company will help the builders to maintain high pace of work at the most complex areas in any weather.